Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes

Product Details
Customization: Available
Material: Steel
Type: Fixed
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
115
Year of Establishment
2018-11-29
  • Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
  • Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
  • Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
  • Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
  • Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
  • Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
Find Similar Products

Basic Info.

Model NO.
ST60306345
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Installation Scaffold
Certification
En39
Surface Treatment
Hot Dipped Galvanization
Transport Package
Steel Pallet
Specification
5′/6′/8′/10′/13′/21′
Trademark
HDRL
Origin
China
HS Code
7306309000
Production Capacity
300000 Tons Per Year

Product Description

Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes


INTRODUCTION:

 

HDRL Galvanized Scaffolding Tubes conform to BS 1139/BS EN 39 Standard. We have our own factory producing galvanized Scaffolding tubes 30,000 tons each month, and 90% of them are for export. Our scaffolding tubes are widely used in all kinds of construction sites such as the oil and gas industry, refinery industry and infrastructure in over 60 countries.

We have a wide range of round scaffolding tubes. If you require a specific size, such as different thickness or a different length, please send us your detail requirements. Our quotation will always base on your requirements.


TABLE OF PRODUCTS PARAMETERS:
 
Place of Origin China
Brand Name HDRL
Size of Tube 48.3/60.3
Material Standard Q235 /Q345/Q355 carbon steel
Surface Treatment hot dipped galvanization
Packaging Detail steel pallet, or packed in bundle
Delivery Detail 20-30 days after deposit.
Basic Components  
manufacturing OEM&ODM

TUBE SPECIFICATION:
Item No. Steel Grade Size          Weight (kgs)
ST48306235 Q235 48.3mmx3.0mmx6000mm 20
ST48326235 Q235 48.3mmx3.2mmx6000mm 21.3
ST48406235 Q235 48.3mmx4.0mmx6000mm 26.2
ST48306345 Q345 48.3mmx3.0mmx6000mm 20
ST48326345 Q345 48.3mmx3.2mmx6000mm 21.3
ST48406345 Q345 48.3mmx4.0mmx6000mm 26.2
ST60306235 Q235 60.3mmx3.0mmx6000mm 25.4
ST60326235 Q235 60.3mmx3.2mmx6000mm 27
ST60406235 Q235 60.3mmx4.0mmx6000mm 33.3
ST60306345 Q345 60.3mmx3.0mmx6000mm 25.4
ST60326345 Q345 60.3mmx3.2mmx6000mm 27
ST60406345 Q345 60.3mmx4.0mmx6000mm 33.3

FACTORY PHOTOS:

Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
PRODUCTS PHOTOS:

Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes

Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes

Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes

PRODUCTION PROCESS:
Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes

CERTIFICATION:
Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
Gi Pipe Steel Scaffolding Galvanized Scaffold Tubes
Q1: Are you a factory or trading company?    
A: We are a factory specializing in manufacturing all kinds of scaffolding material.

Q2: Where is the loading port?
A: Qingdao port or Tianjin port

Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one pallet is preferred.

Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.

Q5: Can I get some samples?    
A: Yes, Sample is free, but usually the customer will pay for the shipping cost. 

Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.

Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.

Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier